Completed

Projects

2026 Meola Reef
  • 900m long site access road installed and removed for project.

  • 2500 Tonne of Rock Sea Wall Protection 

  • Recontouring of park reserve to maintain stormwater flow

  • Busy pedestrian site with Dog park and scenic reserve remaining open for project duration 

  • Project completed withing programme allowance and under budget

Belinda Green
Reid Arena

From initial earthworks through to final completion, this project delivered a high-quality, purpose-built horse arena designed for performance, durability. The works included site preparation, excavation, drainage installation, foundation and base construction, arena surfacing, and finishing works. Every stage was carefully managed to ensure a safe, stable, and functional facility that meets the clients needs of both horses and riders. The completed arena provides an exceptional training and competition environment built to stand the test of time.

Belinda Green
2016/2017 New Zealand Steel, East Landfill 1B.4
IMG_5741.JPG

This project consisted of approximately 70,000 cubic meters of earthworks and 2ha of liner to further develop the east landfill at the Glenbrook site. The project was designed by Tonkin & Taylor. The landfill is constructed over soft alluvial clays. Instruments are installed to monitor porewater and settlements as fill is placed. The liner install requires vigorous testing with permeability tests ultimately determining the suitability of the liner.

Anna Varma
2016 New Zealand Steel, East Landfill 1B.2
20160420_174832.jpg

This project consisted of approximately 50,000 cubic meters of earthworks and 2ha of liner to provide necessary airspace for waste. The project delivery was critical to provide much needed airspace for Steel Service.

Anna Varma